July, 2010
Successfully delivered 3D designs and detailed Manufacturing drawings for over 2000 Pipe supports for a very large major desalination plant.
Successfully delivered 3D designs and detailed 2D drawings for a chemical plant's process Piping engineering involing layout plans, layout sections, pipe isometrics, pipe supports, etc; for a mutinational giant in Chemicals manufacturing.
|
 |
|
|
 |
|
|
 |
|
July, 2010
Successfully delivered 3D designs and detailed Manufacturing drawings for over 2000 Pipe supports for a very large major desalination plant.
Successfully delivered 3D designs and detailed 2D drawings for a chemical plant's process Piping engineering involing layout plans, layout sections, pipe isometrics, pipe supports, etc; for a mutinational giant in Chemicals manufacturing.
|
|
June, 2010
Entered the EPC market of Material handling system for power plants by securing a major order for a Coal handling system on a Turnkey basis for a 30 MW power plant. |
|
May, 2010
Received a major order for manufacture and supply of a High Temperature 100 metre long Tunnel Kiln for manufacture of Ceramic Sanitaryware based on latest state of the art Italian technology. This repeat order from the client, is a testimony for the reliability and dependability of Mech Tech as a sullier of high temperature kilns for Ceramic Industry. |
|
April, 2010
Received Orders for design and supply of 20 agitators for a Sugar Mill. Cost effective, efficient and optimised design using latest 3D design softwares, earned a name for Mech Tech as a prefered supplier for agitators for Sugar mill process applications. Now, Mech Tech is well on its way to receive repeat orders. |
|
Mar, 2010
Expanded the software capability by commencing Pro/E 3D product designs with Piping and tubing modules for a leading OEM supplier for Tyre Industry. |
|
Feb, 2010
Signed an MOU with an Europian EPC contract major, Duro Felguera S.A Energia, Spain, for Detail Engineering of Combined Cycle Power Plants. During the Themal Power India 2010 conference at Delhi on 28-29 Jan 2010, DFE & Mech Tech anoumned their entry into Indian Gas fired power plant market .
|
|
Jan, 2010
New Year started with receipt of a prestigious order for Piping layout & support engineering with all associated engineering activities for a metallurgical Industry in Europe |
|
Dec, 2009
Received a major order for consulting and engineering for two High Voltage substations at Yemen inclusive of elctrical, Civil and Strutural engineering to meet International standards. |
|
NOV, 2009
Received orders for layout and Piping & support engineering for a chemical complex involving 10 (ten) Inorganic chemicals |
|
Oct, 2009
ISO 9001-2008 certificated for Design & Engineering of Process Plants covering Mechanical, Piping, Electrical, Instrumentation, Civil & Structural. |
|
Sep, 2009
Received two awards in the COADE user conference 2009 at Houston, TX, USA for CADWorx plant design solutions & CEASAR II anaysis
Major SmartPlant P&ID work; develepment of P&IDs (total project P&IDs ) for an Europian Client. |
|
August 2009
Awardered 3D Modeling of One Thousand (1000) pipe supports and fixing them in the 3D Piping Layout Model. |
July 2009
Awardered piping and pipe supports detail engineering contract for a desalination plant in Australia. |
|
|